May 27, 2025
The purpose of the duplex elevator modernization project is to upgrade the performance, safety, reliability, and energy efficiency of the existing elevator system serving The Press Office Building. The modernization will address aging components, improve ride quality, ensure compliance with current codes and accessibility standards, and enhance user experience through modern control technologies.
Schedule:
Start: June 9, 2025
The work will continue through the Beginning of September 2025.
Construction Impacts/Disruptions: Throughout the project, building occupants and visitors can expect the following:
- Building access will be maintained throughout modernization.
- Modernization will begin on the north car followed by the south car.
- One elevator is expected to remain operational during standard business hours throughout modernization.
- If the operational elevator happens to breakdown and someone needs to get out of the building and requires the elevator you need to contact UCPD at 123 or 773-702-8181.
- Construction activities are expected between 6 am and 2 pm, Monday thru Friday for the duration of modernizations.
- There will be periods of significant noise inside the building associated with work activity. Noise will include drilling, sawing, and banging of metal.
- Carpeted areas will be covered with securely placed floor protection along hallways surrounding the elevator machine room.
For questions and concerns please reach out to Crystal Szewczyk, project consultant ccarlson2@uchicago.edu.