Construction activity will start on/about Monday, June 13, to renovate the Education Study Room at the Smart Museum. 

The construction activity includes: 

  • Convert the existing study area into a larger study room. Removal of an existing interior wall. Relocating existing mechanical and electrical systems, installing new light fixtures, furniture, finishes, and tile flooring. Reconfigure coat room. 
  • A shared dumpster with a CWAC project will be placed on the east side of the Young Building parking lot. 

Throughout construction, the campus community can expect the following: 

  • Access to the loading dock will be maintained throughout construction. 
  • There will be noise associated with certain work activities. 
  • Building access will be maintained. 
  • Signage will be in place, as needed. 
  • Scheduled completion is by end of the day, Friday, Sept. 16. 

For questions, please contact Carlos Martinez, project manager, at cimartinez@uchicago.edu.

Thank you for your patience throughout this project. 


How Do I?

UChicagoSocial: Facilities Services

{/exp:channel:entries}