UChicago logo

The University of Chicago: Facilities Services

Campus Plan & Construction
 

SUMMER 2009 CORE CAMPUS PROJECTS

separator line

maroonConstruction Projects   orangePaver Projects

Map of Main Quad Summer 2009 projects
Mansueto Library Main Quad Paver Projects Main Quad Paver Project, Rockefeller Chapel Quad Pedestrianization Jones Facade Restoration Math-Stat Renovation Center for Gender/Race Studies Roof Replacement Pick Hall Chilled Water Project Gates-Blake Riser Replacements & Restroom Remodeling Harper Library ADA Ramp Installation Social Science Research Portico Foster Facade Partial Restoration Midway Crossings

At left is a map of the campus Main Quadrangle area (showing 56th to 60th, Ellis to Woodlawn) highlighting the Summer 2009 projects. Click a maroon or orange area or a project label to see details about that project, or select a project below:

For an annotated map of the Main Quadrangle Paver Project, including alternate building entrances and pedestrian re-routing, see Main Quadrangle Paver Project Logistics Plan [PDF].